The first stage of the Mamyri - Penino - Sharapovo highway was completed in TINAO
The first stage of construction of the highway Mamyri - Penino - Sharapovo has been completed in New Moscow. This was reported on Monday, September 23, by Vladimir Efimov, Deputy Mayor of the capital on urban policy and construction.
The length of the road is about 10 km. Four artificial structures were built: a bridge-type overpass, tunnel-type overpasses and a bridge, reports NSN. The roadway of the highway is divided into four lanes. On each side was allocated two lanes, writes "Moscow 24". Also sidewalks for pedestrians were built.
The first section of the highway with a length of 1 km was introduced in June 2021. It connected Nikolo-Khovanskaya street with the highway Solntsevo - Butovo - Varshavskoe highway. So the citizens got a short way to the metro station "Prokshino" and a direct exit to the highway Solntsevo - Butovo - Varshavskoe highway, reports 360.ru.
The first phase of the highway Mamyri - Penino - Sharapovo will improve the transportation infrastructure of several settlements of TinaO, notes kp.ru.
September 20 In a year of work, the mayor of the capital Sergey Sobyanin said that the Moscow High-Speed Diameter became one of the three most popular urban highways. Every year about 400 thousand cars pass along the MSD. It is the longest high-speed diameter in Russia.